Click
on images to zoom in.
|
|
|
 |
Some of the Special, flexible
levelling
compounds used. |
Freshly laid Special levelling compound used on
Aluminium or Steel substrate.
|
The levelling compound after setting overnight, looking from the Wharf end. |
|
|
|
Setting out the Comcork
AquaDeck
ready to glue.
|
The finished walkway with
a yellow
Comcork
safety indicator.
|
Side view of the walkway.
|
|
|
|
Laying of the cement levelling compound
prior to installation of hazard indicator.
|
The hazard indicator installed flush to the Wharf surface.
|
Floating in the pontoon on high tide, the
walkway will span over too the barge.
|
|
|
|
The walkway was craned in and is now spanned across to the pontoon.
|
|
On high tide, looking from the pontoon,
back to the Wharf.
|
Go to Job Portfolio
|